The Site Is a Power Question
I am co-founder and principal of Turks Capital Partners, and we are developing data centers across the country. A data center is a building that has to answer for the grid, rather than treat electricity as someone else’s problem. I have spent my career in real estate, in land and leases and in the long argument between a purchase and a use that works, and the habit that carries over is simple: I ask what the parcel can be connected to, and on what timetable, before I fall in love with it.
Power access
Power comes first. A site with a handsome price and no credible path to electricity is a land trade, not a data center. Before I care about acreage, I want to know where the transmission is, what a new or expanded substation would actually take, who has already claimed the capacity ahead of us, and whether a utility’s queue is a plan or a press release. A megawatt figure for a Turks Capital site will appear here when it is real enough to stand on, because capacity is the product and a guess is how this business embarrasses itself. Cooling and water belong to a specific design, so I keep them attached to that design rather than turning them into a slogan that pretends every site is the same machine.
Site selection
Site selection is the same question, widened. After power comes land that can physically hold the building and the yard, then the road that construction and operations will use, then the jurisdiction that will live with the noise, the lighting at night, and the tax bill. Some sites are right because the power is close and the land is plain. We are not shopping for a view. “Across the country” describes that task. It is not a list of cities, and no address goes on the data centers page until we are prepared to say it in public. The user of the building does not owe us a coastal zip code. The constraint is where power can be delivered, and where a community will accept the building.
AI and hyperscale demand
The demand I am underwriting has two names that are already in common use: hyperscale computing, and AI. Both want more data center capacity than the last cycle of buildings was laid out for, and both are indifferent to a sponsor’s preferred city. They are not the same shape. A hyperscale requirement, in the abstract, is a long program of phased buildings and a power ramp, for a customer who already knows what a data hall is. AI has made the power conversation sharper, because the equipment draws more heavily and the forecasts move. The practical effect, from the chair I sit in, is that site selection has become a power-and-delivery problem that happens to close on land.
Who does the work
The team is not a real estate group that has learned a new vocabulary. Turks Capital’s data center work includes development experts who have done this before, including former engineers from Oracle and AWS, people who have lived inside large computing environments and will argue with a site plan. Their former employers are part of that experience. Oracle and Amazon Web Services are not partners in these projects, and nothing here should be read as their endorsement. What stays with me is the land, the entitlement, and the conversation with the place. A data center that is engineered carefully and entitled carelessly does not get built, and a data center that is entitled quickly and cannot be powered is a shell.
When there is a site we will name, a capacity we will state, or a customer or partner we will identify, it will go on the data centers page in plain language, with a source. Until then the order of operations is the useful thing to say: power, then the parcel, then the building, then the name.
Perspective by Adam Craig Hochfelder, co-founder and principal of Turks Capital Partners. This is not investment advice, and it does not announce a transaction.