I am co-founder and principal of Turks Capital Partners, and we are developing data centers on two tracks that call for different buildings.

The first is ground-up hyperscale, from 100 megawatts to a gigawatt and more, with on-site natural gas as the primary power. The lease we underwrite is single-tenant and triple-net, written for a credit tenant that needs medium-to-high rack density, and the use is training large models and running inference. The second track is the acquisition and upgrade of facilities already sitting in major U.S. markets, with fiber or wireless connectivity at about five milliseconds of latency or less, for mission-critical systems and for inference that cannot wait on a long haul. This essay is about the power choice on the first of those tracks.

Natural gas is the practical primary power for that building in the near term. It can be built, contracted, and run while small modular reactors and the next generation of batteries are still maturing, which is why I treat it as a bridge rather than as a final answer.

Reliability comes first. The designs we are underwriting target 99.999 percent uptime, and gas does not depend on the weather. A training run arrives as a spike rather than a flat line, and gas can be brought up for that spike on a timetable a new transmission line will not match. The same plant, sitting on the site, is also a microgrid, a backstop if the utility grid fails. The Department of Energy has put the cost of blackouts to the U.S. economy at $150 billion a year, which is already enough to price the cost of a dark hall into the decision.

Land is the second reason. Gas is energy-dense, so the power plant takes less of the parcel. In markets where land is already tight, such as Northern Virginia, Silicon Valley, and Dallas, that smaller footprint decides whether the site can hold both the halls and the generation. Those cities are examples of constrained land, not a list of Turks Capital campuses. We have not published a site, a megawatt figure for a Turks Capital project, or a customer, and the ranges in this essay describe the approach rather than a measured asset.

Cost is the third reason, and it belongs with its source. Lazard’s levelized-cost analysis puts the build cost of natural gas around $700 to $1,000 per kilowatt, against $1,200 to $1,500 per kilowatt for solar plus storage. A long-term fixed-price gas contract is what keeps that cost predictable after the plant is in the ground. I use Lazard as the comparison that makes gas the near-term choice, not as a forecast of our own returns.

Demand is what makes the timetable short. The International Energy Agency estimates that power growth from large AI models is running 20 to 30 percent a year. Training wants the large, steady, on-site block, while inference that cares about latency is often better on the second track, close to the user, in a building we upgrade rather than invent. Keeping those two problems apart is the strategy.

The people who can draw this are already on the team, including former engineers from Oracle and AWS. That names prior employment, not a partnership and not an endorsement by either company. Members of our data center team have designed a facility that uses natural gas as primary, backup, or temporary power, with 2N+1 redundancy, a power island that can run without the grid, closed-loop cooling that does not evaporate water, about 18 megawatts in total and 7.5 megawatts of critical IT, and a layout drawn so hydrogen can be blended in over time. That is design experience from earlier roles. It is not a Turks Capital completion, and it is not an asset we are listing.

A Turks Capital address, or a megawatt figure for a Turks Capital project, will go on this site when it is real enough to stand on. Until then, the power that can be stood on for the hyperscale track is natural gas.